Home

New project checklist

Every launch. Must-pass pillars: OG, Socials, and Desktop · iPad · Mobile. Then domain, DNS, email, brand, GA4, ship. Ticks save in this browser. Reviewed weekly.

0 / 93 done · 0% · critical 0/25Weekly review · pillars: OG · Socials · Desktop/iPad/Mobile

Progress saves in this browser only.

OG

Static PNG/JPG 1200×630, non-empty body, metadata wired, curl size ≫ 0

Socials

X + TG (at minimum) · avatars/headers · bio links · footer row · draft→approve

Desktop · iPad · Mobile

Design + verify all three · inputs ≥16px · no field zoom · touch targets

Must-pass pillars

0/7

Ship is blocked until OG, socials, and all three breakpoints pass.

0. Intent

0/5

1. Telegram / session

0/4

2. Domain & DNS

0/7

3. Email

0/4

4. Repo & code baseline

0/11

5. Brand

0/7

6. Open Graph (critical)

0/5

First impression in every share. Empty or SVG OG = failed ship.

7. Socials (critical)

0/8

Accounts, assets, and site chrome — not optional polish.

8. Desktop · iPad · Mobile (critical)

0/6

Three real layouts. Not one layout that kinda shrinks.

9. Analytics & SEO

0/6

10. Infra & secrets

0/6

11. Legal / ops

0/4

12. Ship loop

0/9

13. Closeout

0/4

Do not

  • Emoji in UI
  • SVG OG or favicon
  • Empty OG body
  • Skip socials
  • Desktop-only layout
  • Inputs under 16px on mobile
  • PostHog
  • DexScreener
  • Public repo by default
  • Push to main
  • Tweet before live
  • Skip GA4

Quick ID block

Name:
Slug:
One-liner:
Domain:
Registrar:
CF zone:
Preview: https://<slug>.metasal.xyz
Prod:
Telegram topic ID:
Repo:
Worker/Pages name:
Email:
X @:
TG:
GA4:
Colours:
Fonts:
Logo path:
Press:
OG path (1200×630 PNG):
Desktop pass:
iPad pass:
Mobile pass:

metasal.xyz/checklist